archive-com.com » COM » I » IMASA.COM

Total: 849

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • IMASA, INGENIERÍA Y PROYECTOS, S.A. / Actualité / Nouvelles
    Publications Multimedia Fin du Menu Secondaire Nouvelles 03 05 2010 IMASA awarded for its Occupational Risk Prevention System IMASA has been awarded with the second prize in the 6th safety ArcelorMittal Asturias subcontractors awards IMASA certified to occupational health and safety management systems namely OHSAS 18001 2007 has received this prize due to a safety behaviour of its workers and contractors highlighting its responsibility and commitment This reward was also

    Original URL path: http://www.imasa.com/fr/cargarAplicacionNoticia.do?texto=&identificador=43&fechaDesde=&idCategoria=0&fechaHasta= (2016-02-12)
    Open archived version from archive


  • IMASA, INGENIERÍA Y PROYECTOS, S.A. / Actualité / Nouvelles
    Nouvelles 15 04 2010 IMASA participates in the annual EUROCOKE summit 2010 EUROCOKE summit 2010 the European forum for steel and met coke market EUROCOKE 2010 is taking place April 27 29 in Lisbon Portugal An event to learn from industry experts and receive information to succeed in this challenging industry The meeting includes a sector overview market trends and technical innovation in coke ovens and steelmaking a steel market

    Original URL path: http://www.imasa.com/fr/cargarAplicacionNoticia.do?texto=&identificador=39&fechaDesde=&idCategoria=0&fechaHasta= (2016-02-12)
    Open archived version from archive

  • IMASA, INGENIERÍA Y PROYECTOS, S.A. / Actualité / Nouvelles
    useful and complete space This new dynamism is focused on up dating the contents in order to adapt to the expectation of users and show more specific precise information on the new activities and the services developed All of this within the framework of the strictest compliance with accessibility parameters The agility of the browser and the search for contents is based on the files of the most significant projects

    Original URL path: http://www.imasa.com/fr/cargarAplicacionNoticia.do?texto=&identificador=26&fechaDesde=&idCategoria=0&fechaHasta= (2016-02-12)
    Open archived version from archive

  • IMASA, INGENIERÍA Y PROYECTOS, S.A. / Actualité / Nouvelles
    Menu Secondaire commence Nouvelles Publications Multimedia Fin du Menu Secondaire Nouvelles 17 08 2009 New Plasma Cutting Line IMASA s Manufacturing Division in the frame of its continuous process of upgrading and revamping the production equipment has recently purchased and put into operation a state of the art plasma cutting machine The outstanding features of this equipment will contribute to offer our clients an even more versatile service together with

    Original URL path: http://www.imasa.com/fr/cargarAplicacionNoticia.do?texto=&identificador=28&fechaDesde=&idCategoria=0&fechaHasta= (2016-02-12)
    Open archived version from archive

  • IMASA, INGENIERÍA Y PROYECTOS, S.A. / Actualité / Nouvelles
    Nouvelles 14 07 2009 IMASA carries out the revamping of the coke oven regenerators at Gijón Spain The turnkey project includes all the necessary works to carry out the revamping of regenerator s first cells from coke oven batteries 1 2 in ArelorMittal factory in Gijón Spain IMASA has been awarded with the project from the design and engineering to the final commissioning of the facilities including the site preparatory

    Original URL path: http://www.imasa.com/fr/cargarAplicacionNoticia.do?texto=&identificador=23&fechaDesde=&idCategoria=0&fechaHasta= (2016-02-12)
    Open archived version from archive

  • IMASA, INGENIERÍA Y PROYECTOS, S.A. / Actualité / Nouvelles
    Working Consortium with the assembly division of DURO FELGUERA and the company from Tarragona COTINSA Specifically for the Bilbao project IMASA is constructing the ADI 1 000 project consisting of the CK6 unit COKE BLOCK and the units adjacent to it The scope of the IMASA project also includes the mechanical erection and the paintwork project The estimated budget for the project is around 60 million Similarly through the IMASA

    Original URL path: http://www.imasa.com/fr/cargarAplicacionNoticia.do?texto=&identificador=24&fechaDesde=&idCategoria=0&fechaHasta= (2016-02-12)
    Open archived version from archive

  • IMASA, INGENIERÍA Y PROYECTOS, S.A. / Actualité / Nouvelles
    commercial plants for parabolic cylindrical collectors in Europe Andasol I and II The plants are also the first to use melted salts to generate electricity Both plants can be found in Aldeira in Granada with power levels of 50 MW each IMASA executed on both plants the prefabrication and assembly of pipelines and the equipment of the HTF unit of the power island salt unit and the BOP Balance of

    Original URL path: http://www.imasa.com/fr/cargarAplicacionNoticia.do?texto=&identificador=22&fechaDesde=&idCategoria=0&fechaHasta= (2016-02-12)
    Open archived version from archive

  • IMASA, INGENIERÍA Y PROYECTOS, S.A. / Actualité / Nouvelles
    been awarded the project to revamp the ethylene ovens for the REPSOL refinery at Tarragona for the engineering company SELAS LINDE belonging to the German gas company LINDE IMASA is the main contractor on the project and is in charge of the detailed engineering the supply prefabrication and pipeline assembly as well as the entire pipeline disassembly required in the existing furnaces Similarly the scope of the detailed engineering by

    Original URL path: http://www.imasa.com/fr/cargarAplicacionNoticia.do?texto=&identificador=27&fechaDesde=&idCategoria=0&fechaHasta= (2016-02-12)
    Open archived version from archive



  •