archive-com.com » COM » S » SLEIGHTHOLMWORKSHOP.COM

Total: 73

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • Sleightholm Workshop Design + Build | Gunnison, Colorado
    menu at right flooring and railing posts Posted May 23rd 2013 rustic white oak flooring Posted May 23rd 2013 stucco scratch coat moving along Posted May 17th 2013 stucco finally Posted May 13th 2013 west dormer windows cased Posted May 13th 2013 guest bath tile Posted May 13th 2013 Older Entries Projects Atkins Bellamy Denton hale Morrill Null Rystrom Recent Posts looking towards red getting dried in 7 12 girder

    Original URL path: http://sleightholmworkshop.com/2013/05/ (2016-04-28)
    Open archived version from archive


  • Sleightholm Workshop Design + Build | Gunnison, Colorado
    from the projects menu at right east siding Posted April 25th 2013 north siding Posted April 25th 2013 west siding Posted April 25th 2013 blocking under entry door Posted April 20th 2013 replaced sill rim Posted April 20th 2013 rotten sill Posted April 20th 2013 Older Entries Projects Atkins Bellamy Denton hale Morrill Null Rystrom Recent Posts looking towards red getting dried in 7 12 girder garage rake walls north

    Original URL path: http://sleightholmworkshop.com/2013/04/ (2016-04-28)
    Open archived version from archive

  • Sleightholm Workshop Design + Build | Gunnison, Colorado
    projects menu at right bedroom 3 ceiling Posted March 28th 2013 alder ceilings started Posted March 27th 2013 tub tile prep Posted March 27th 2013 shower tile prep Posted March 27th 2013 stonework at fireplace Posted March 26th 2013 kitchen dining w paint Posted March 14th 2013 Older Entries Projects Atkins Bellamy Denton hale Morrill Null Rystrom Recent Posts looking towards red getting dried in 7 12 girder garage rake

    Original URL path: http://sleightholmworkshop.com/2013/03/ (2016-04-28)
    Open archived version from archive

  • Sleightholm Workshop Design + Build | Gunnison, Colorado
    the projects menu at right Saturday call with the boss Posted February 24th 2013 texture at garage Posted February 22nd 2013 drywall progress 3 Posted February 22nd 2013 drywall progress 2 Posted February 22nd 2013 drywall progress Posted February 22nd 2013 8 ACH Posted February 19th 2013 Older Entries Projects Atkins Bellamy Denton hale Morrill Null Rystrom Recent Posts looking towards red getting dried in 7 12 girder garage rake

    Original URL path: http://sleightholmworkshop.com/2013/02/ (2016-04-28)
    Open archived version from archive

  • Sleightholm Workshop Design + Build | Gunnison, Colorado
    right wainscot at front Posted January 27th 2013 closed cell foam at garage Posted January 27th 2013 more wainscot Posted January 24th 2013 starting metal wainscot Posted January 24th 2013 knee brace roofette detail Posted January 20th 2013 service panel radiant heat manifolds in mechanical room Posted January 20th 2013 Older Entries Projects Atkins Bellamy Denton hale Morrill Null Rystrom Recent Posts looking towards red getting dried in 7 12

    Original URL path: http://sleightholmworkshop.com/2013/01/ (2016-04-28)
    Open archived version from archive

  • Sleightholm Workshop Design + Build | Gunnison, Colorado
    individual projects by choosing from the projects menu at right 10 and snowing Posted December 11th 2012 east and north Posted December 11th 2012 windows along cement creek Posted December 11th 2012 windows Posted December 11th 2012 back covered porch Posted December 1st 2012 Projects Atkins Bellamy Denton hale Morrill Null Rystrom Recent Posts looking towards red getting dried in 7 12 girder garage rake walls north elevation Archives December

    Original URL path: http://sleightholmworkshop.com/2012/12/ (2016-04-28)
    Open archived version from archive

  • Sleightholm Workshop Design + Build | Gunnison, Colorado
    menu at right more roof detailing Posted November 29th 2012 back porch timbers Posted November 29th 2012 beam scarf over pegged tenon Posted November 28th 2012 timber post saddle detail Posted November 28th 2012 eaves detailing Posted November 28th 2012 front coverded porch framing Posted November 28th 2012 Older Entries Projects Atkins Bellamy Denton hale Morrill Null Rystrom Recent Posts looking towards red getting dried in 7 12 girder garage

    Original URL path: http://sleightholmworkshop.com/2012/11/ (2016-04-28)
    Open archived version from archive

  • Sleightholm Workshop Design + Build | Gunnison, Colorado
    projects menu at right 4 ply girders for west dormer Posted October 30th 2012 parallel chord trusses Posted October 30th 2012 truss day 1 Posted October 30th 2012 septic tank Posted October 30th 2012 manifold Posted October 30th 2012 leach field absorbtion area Posted October 30th 2012 Older Entries Projects Atkins Bellamy Denton hale Morrill Null Rystrom Recent Posts looking towards red getting dried in 7 12 girder garage rake

    Original URL path: http://sleightholmworkshop.com/2012/10/ (2016-04-28)
    Open archived version from archive



  •