  • U.S. Naval Base Guantanamo Bay Pier C Replacement | S&ME Inc. : 40 years of Engineering Integrity
    causeway and roadway are also planned S ME provided a geotechnical exploration of the Pier C site A truck mounted CME 55 dill rig was used to develop 13 soil test borings Five additional borings were performed over water by mounting the rig on a Navy YC barge The water borings were advanced to depths from about 92 to 120 ft below the water line using mud rotary drilling techniques and split spoon sampling with standard penetration testing performed in general accordance with ASTM D 1586 In addition to the split spoon samples two undisturbed Shelby tube samples were collected in general accordance with ASTM D 1587 The causeway borings were drilled to depths from 6 to 61 ft S ME s reports provided recommendations on earthwork seismic foundations and pavement for the project Also included were information on the exploration and testing procedures our boring logs the laboratory test results Gallery Markets Federal Government Other NASA FBI Parks etc Ports Terminals Transportation Services Engineering Geotechnical The Market Common Myrtle Beach Phase 1 Lower Neuse Trail Greenway Projects By Market By Service Site Links Home Company Markets Services Projects Contact Latest S ME News S ME Names Four New Vice

    Original URL path: http://www.smeinc.com/project/u-s-naval-base-guantanamo-bay-pier-charlie-replacement (2016-04-27)
    Open archived version from archive


  • Jefferson Lake Dam Evaluation And Design Services | S&ME Inc. : 40 years of Engineering Integrity
    the lake and a land survey of the dam and downstream area With this information stability and H H analyses were performed to assess the factor of safety against failure during a flood These analyses suggested that the existing spillway capacity is inadequate and significant overtopping of the dam may occur S ME in conjunction with our subconsultant Jobes Henderson is in the process of developing construction plans to assure the long term performance of the dam These improvements may consist of a new sheet pile wall at the toe of the spillway for scour attenuation roller compacted concrete RCC overtopping protection and a new lake drain In addition S ME is developing inundation mapping associated with an Emergency Action Plan for the dam In the future it is anticipated that S ME will assist Ohio Department of Natural Resources in administrating the construction of these improvements Gallery Markets Dams Facilities State Services Civil Construction Materials Testing Engineering Geotechnical John R Doutt Upground Reservoir The Market Common Myrtle Beach Phase 1 Projects By Market By Service Site Links Home Company Markets Services Projects Contact Latest S ME News S ME Names Four New Vice Presidents S ME honored with 2016

    Original URL path: http://www.smeinc.com/project/jefferson-lake-dam-evaluation-and-design-services (2016-04-27)
    Open archived version from archive

  • Civil Services | S&ME Inc. : 40 years of Engineering Integrity
    with ms consultants as the design professional during construction of the new 9 2 billion gallon upground reservoir The reservoir is over 850 acreas and will include a composite liner which Read More George Poston Park Dam Markets Dams Facilities Government Local Municipal Public Works Services Civil Engineering Geotechnical Natural Resources S ME was retained by Gaston County Public Works in 2007 to provide multiple services in connection with design and development of a dam to create an approximately 11 acre lake on the George Poston Read More William H Zimmer Station Residual Solid Waste Landfill Markets Energy Fossil Landfill Power Services Civil Construction Construction Materials Testing Engineering Environmental Geotechnical Natural Resources Sciences S ME has been providing engineering environmental permitting and design services to Duke Energy formerly Cinergy in support of its Zimmer Landfill Facility since 1996 including the preparation of two separate PTI documents a Read More Duke Energy Allen Steam Station Retired Ash Basin Ash Landfill Markets Energy Fossil Power Services Civil Engineering The Plant Allen Retired Ash Basin Ash Landfill set a North Carolina precedent as the first of its kind and represents a significant step in sustainability by redeveloping a formerly undevelopable brownfield area The project Read More Pleasant Hill Lake Shoreline Stabilization Markets Government Parks Recreation Services Civil Construction Engineering Environmental Geotechnical Natural Resources Sciences Severe shoreline erosion along the Muskingum Watershed Conservancy District s Pleasant Hill Lake at Pleasant Hill Drive had created steep unsafe slopes downed power poles and presented water quality concerns Due to the proximity Read More Furl Williams Upground Reservoir Markets Dams Environment Government Local Municipal Services Civil Construction Construction Materials Testing Engineering Geotechnical Natural Resources Sciences The City of Lima Ohio retained S ME to design permit and administer construction of a new 5 9 billion gallon upground

    Original URL path: http://www.smeinc.com/projects/by-service/engineering/civil (2016-04-27)
    Open archived version from archive

  • John R. Doutt Upground Reservoir | S&ME Inc. : 40 years of Engineering Integrity
    by the presence of shallow sand and gravel deposits as well as karst solutioned limestone The composite liner will consist of 18 inch thick compacted clay liner CCL overlain by a 40 mil thick Flexible Polypropylene fPP The geomembrane will be overlain by a geotextile and an 18 inch thick soil cover Dewatering wells are required to maintain lower groundwater levels during construction Groundwater monitoring is performed with numerous shallow and deep monitoring wells and piezometers under the liner and under the embankment S ME provided geotechnical engineering services and construction dewatering recommendations for an inflatable weir being constructed across the Scioto River the 180 million gallon per day pump station and more than two miles of 60 inch diameter raw water line Gallery Markets Dams Government Local Municipal Services Civil Construction Engineering Geotechnical Hyundai Motor Manufacturing Alabama HMMA Automotive Assembly Plant Jefferson Lake Dam Evaluation And Design Services Projects By Market By Service Site Links Home Company Markets Services Projects Contact Latest S ME News S ME Names Four New Vice Presidents S ME honored with 2016 South Carolina Chamber Safety Award S ME recognized with ACEC Tennessee Engineering Excellence Award Edgecombe County Landfill Gas to Energy Project Wins

    Original URL path: http://www.smeinc.com/project/9-2-billion-gallon-upground-reservoir (2016-04-27)
    Open archived version from archive

  • CUY-Pedestrian Bridge (Voinovich Pedestrian Bridge) | S&ME Inc. : 40 years of Engineering Integrity
    span double leaf bascule bridge of cable stay construction with a curved alignment The pedestrian bridge will connect Voinovich Bicentennial Park on the northeastern portion of the harbor with the Great Lakes Science Center Rock and Roll Hall of Fame and William G Maher Steamship Museum located on the south and west sides of the harbor S ME completed the Environmental Site Assessment ESA Screening memorandum of agreement MOA level Ecological Survey permit determination PD per Ohio Department of Transportation ODOT Waterway Permit applications including USACE NWP USACE Approval to Authorize Modification and US Coast Guard USCG Section 9 permit as well as a Quality Assessment Quality Control QAQC plan Gallery Markets Government Greenways Trails Local Municipal Parks Recreation Transportation Services Engineering Environmental Environmental Sciences George Poston Park Dam Volkswagen Assembly Plant Projects By Market By Service Site Links Home Company Markets Services Projects Contact Latest S ME News S ME Names Four New Vice Presidents S ME honored with 2016 South Carolina Chamber Safety Award S ME recognized with ACEC Tennessee Engineering Excellence Award Edgecombe County Landfill Gas to Energy Project Wins Engineering Excellence Award OTEC Hosts Three S ME Experts Jason Vaughn Awarded SC Engineer of the Year

    Original URL path: http://www.smeinc.com/project/cuy-pedestrian-bridge-voinovich-pedestrian-bridge (2016-04-27)
    Open archived version from archive

  • George Poston Park Dam | S&ME Inc. : 40 years of Engineering Integrity
    the new High Hazard dam to permit construction of the dam The dam is approximately 35 feet in height with a 10 foot by 10 foot cast in place concrete riser box connected to a 6 foot diameter reinforced concrete pipe outlet S ME also assessed the hydrologic contribution of the watershed to the lake Due to the close proximity of houses immediately downstream of the proposed dam S ME modeled the potential flooding of the downstream channel resulting from a simulated breach of the dam S ME used the data from the breach analysis to identify the impacted homes and to prepare an Emergency Action Plan for the dam S ME performed a geotechnical subsurface exploration and geotechnical analyses for the new dam embankment including review of previous engineering studies at the site performing soil test borings exploring potential dam borrow sites performing extensive laboratory testing to estimate embankment material engineering properties and strength and seepage and slope stability analyses required to meet North Carolina Dam Safety requirements for a High Hazard Dam The seepage and slope stability analyses considered the stability of routine operating conditions as well as extreme events such as rapid drawdown conditions for upstream dam slope and earthquake loading for the downstream slope In addition to dam design services S ME provided jurisdictional delineation of on site streams and wetlands protected species and cultural resources assessments and acquisition of an Individual Permit IP from the U S Army Corps of Engineers and 401 Water Quality Certification WQC from the North Carolina Division of Water Quality DWQ for the project To account for the unavoidable loss of the on site stream S ME also developed a mitigation plan that included construction of littoral shelves vegetated with wetland plant species along portions of the lake preservation of

    Original URL path: http://www.smeinc.com/project/george-poston-park-dam (2016-04-27)
    Open archived version from archive

  • Natural Resources Services | S&ME Inc. : 40 years of Engineering Integrity
    Natural Resources Sciences S ME completed natural resource services for waters of the U S including wetlands delineations protected species literature and field reviews including coordination of a freshwater mussel survey and an archaeological survey and completion of Read More Greenville County Pipeline Markets Energy Natural Gas Oil Gas Services Natural Resources Sciences S ME performed natural resources services for the Greenville County Pipeline project in South Carolina This 10 mile natural gas pipeline extends from U S Highway 25 to U S Highway 29 in Greenville County South Carolina Read More William H Zimmer Station Residual Solid Waste Landfill Markets Energy Fossil Landfill Power Services Civil Construction Construction Materials Testing Engineering Environmental Geotechnical Natural Resources Sciences S ME has been providing engineering environmental permitting and design services to Duke Energy formerly Cinergy in support of its Zimmer Landfill Facility since 1996 including the preparation of two separate PTI documents a Read More Cleveland Municipal Airport Creek Relocation Markets Aviation Government Local Municipal Transportation Services Natural Resources Sciences PDC Consultants and S ME overcame significant challenges during design of the new Cleveland Municipal Airport including gaining a TDEC Individual Construction Stormwater Permit This permit is one of the first in Tennessee requiring Read More Pleasant Hill Lake Shoreline Stabilization Markets Government Parks Recreation Services Civil Construction Engineering Environmental Geotechnical Natural Resources Sciences Severe shoreline erosion along the Muskingum Watershed Conservancy District s Pleasant Hill Lake at Pleasant Hill Drive had created steep unsafe slopes downed power poles and presented water quality concerns Due to the proximity Read More Furl Williams Upground Reservoir Markets Dams Environment Government Local Municipal Services Civil Construction Construction Materials Testing Engineering Geotechnical Natural Resources Sciences The City of Lima Ohio retained S ME to design permit and administer construction of a new 5 9 billion gallon

    Original URL path: http://www.smeinc.com/projects/by-service/sciences/natural-resources (2016-04-27)
    Open archived version from archive

  • The Realignment Of Love Creek | S&ME Inc. : 40 years of Engineering Integrity
    restoration design that included the use of rock vanes j hooks and step pools A major design factor was the need to comply with no rise provisions of the Federal Emergency Management Agency FEMA and City of Knoxville and prepare a Conditional Letter of Map Revision CLOMR for FEMA Intensive modeling was undertaken using the U S Army Corps of Engineers HEC 2 and HEC RAS surface water models as part of satisfying these requirements This iterative modeling resulted in modifications to the design to meet the government requirements A comprehensive approach to construction storm water management was also incorporated into the design This project provided several benefits to the community including allowing an existing big box retailer to expand in place rather than relocating and creating a gray field site as well as improving the natural resource value of Love Creek The construction and mitigation project was completed in February 20 Our client expressed satisfaction and appreciation of S ME s achievements in overcoming challenges to meet and exceed the project s rigid needs We worked closely with client and owner representatives to complete tasks on schedule and within budget Gallery Markets Commercial Local Municipal Parks Recreation Retail Services

    Original URL path: http://www.smeinc.com/project/the-realignment-of-love-creek (2016-04-27)
    Open archived version from archive



  •