archive-com.com » COM » T » TURBONETICSINC.COM

Total: 34

Choose link from "Titles, links and description words view":

Or switch to "Titles and links view".
  • Jobs and Careers | Turbonetics Performance
    Wastegate Godzilla BOV Accessories Exhaust Elbow Kit Turbo Systems Camaro SS V8 2010 2013 Shop Jobs and Careers Thank you for your interest in employment at Turbonetics If we are currently hiring you will find all of the information you are looking for here Please be aware that Turbonetics runs a drug free workplace and requires pre hiring drug testing We are also proud to be a participant in the

    Original URL path: http://www.turboneticsinc.com/performance/page/jobs-and-careers (2016-02-15)
    Open archived version from archive


  • Supplier Information | Turbonetics
    be used as an acceptable substitute for a signature if the stamp contains elements that both identify the stamp as belonging to Quality Assurance personnel for example the letters QA on the stamp as well as a unique identifier that ties the stamp back to a specific individual for example a number or set of initials on the stamp If the Turbonetics Purchase Order is requesting Procurement Requirement 6 0B and or 7 0 the certification of conformance MUST contain the heat lot number from the material certification and be accompanied by said material certification so that traceability to the original material manufacturer can be maintained The material certification must be from the ORIGINAL material manufacturer where the raw material was melted poured etc B CHEMICAL TEST REPORTS Shall show the results of quantitative analysis of the composition of materials furnished by the Supplier This evidence must fully comply with the applicable drawing s and or specification s including revision as specified on the Purchase Order The document must be an original copy of the material certification from the mill foundry other business entity where the material was originally produced This document must have 1 typed or printed name 2 Signature of the person 3 The title of the person authorized to act as the Quality Assurance agent A stamp may be used as long ALL three 3 elements are included in such stamp The stamp must be traceable back directly to the person authorized to use it For the purposes of this Procurement Requirement signature is defined as a handwritten depiction of the first and last name of the individual signing the document An electronic signature is only acceptable if it consists of a scanned image of the handwritten signature described in the previous sentence A stamp may be used as an acceptable substitute for a signature if the stamp contains elements that both identify the stamp as belonging to Quality Assurance personnel for example the letters QA on the stamp as well as a unique identifier that ties the stamp back to a specific individual for example a number or set of initials on the stamp A typed or printed name is not a permissible substitute for a signature C PHYSICAL TEST REPORTS Shall show the results of physical test s required by the applicable specification s as specified on the Purchase Order and applicable design drawing This data is for specimens prepared processed and tested at the producing mill in accordance with the material specification This document must have 1 typed or printed name 2 Signature of the person 3 The title of the person authorized to act as the Quality Assurance agent A stamp may be used as long ALL three 3 elements are included in such stamp The stamp must be traceable back directly to the person authorized to use it For the purposes of this Procurement Requirement signature is defined as a handwritten depiction of the first and last name of the individual signing the document An electronic signature is only acceptable if it consists of a scanned image of the handwritten signature described in the previous sentence A typed or printed name is not a permissible substitute for a signature A stamp may be used as an acceptable substitute for a signature if the stamp contains elements that both identify the stamp as belonging to Quality Assurance personnel for example the letters QA on the stamp as well as a unique identifier that ties the stamp back to a specific individual for example a number or set of initials on the stamp D MATERIAL FURNISHED BY TURBONETICS Any material and or parts furnished to supplier by Turbonetics shall be noted on the Certification of Conformance with the following statement The following materials noted herein were furnished by Turbonetics E FUNCTIONAL AND NON FUNCTIONAL TESTS Certificate attesting that test reports which ensure conformance to the drawing and or specification requirements are on file and available for review When Turbonetics source inspection is imposed 3 0 B test reports shall be presented with the product for review in addition to the Certification This requirement shall be included on the certification of conformance F HEAT TREAT Certification attesting that all thermal treatment was performed to listed specifications in calibrated and certified equipment and processes The certification shall list process parameters and results as applicable G SPECIAL PROCESS CERTIFICATIONS Certification that the listed special process es conform to requirements The certification shall list the test results and process parameters as applicable H NONDESTRUCTIVE TESTS NDT X Ray A report on each test is required which specifies the type of test the controlling specification standard the laboratory control number the acceptance criteria utilized and the test results Technician s to be certified personnel if applicable and items to be processed in accordance with applicable drawings specifications procurements instructions and standards This document must have 1 typed or printed name 2 Signature of the person 3 The title of the person authorized to act as the Quality Assurance agent A stamp may be used as long ALL three 3 elements are included in such stamp The stamp must be traceable back directly to the person authorized to use it For the purposes of this Procurement Requirement signature is defined as a handwritten depiction of the first and last name of the individual signing the document An electronic signature is only acceptable if it consists of a scanned image of the handwritten signature described in the previous sentence A typed or printed name is not a permissible substitute for a signature A stamp may be used as an acceptable substitute for a signature if the stamp contains elements that both identify the stamp as belonging to Quality Assurance personnel for example the letters QA on the stamp as well as a unique identifier that ties the stamp back to a specific individual for example a number or set of initials on the stamp The report must include signature and title

    Original URL path: http://www.turboneticsinc.com/industrial/support/supplier-information/ (2016-02-15)
    Open archived version from archive

  • QUALITY MANAGEMENT SYSTEMS | Turbonetics
    outside inspectors Our in house inspectors are constantly examining both products and process to guarantee that product conformity and maximum performance is achieved the first time and every time After all our Customer is our most important inspector Manufacturing and Quality work hand in hand utilizing state of the art inspection devices to assure conformity is maintained through machining processes our CMM uses PC DMIS CAD software that supports IGES files to be sent from Engineering to Quality for 3D modelling verification All verification and conformity gages instruments and tooling are calibrated in accordance with ANSI NCSL Z540 and only use Metrology laboratories that meet ISO IEC 17025 Turbonetics meets and exceeds all requirements of ISO 9001 2008 and holds certification with PRI as our Registrar which is ANAB accredited Turbonetics also supports and meets all Production Parts Approval Process PPAP in accordance with ISO TS16949 Quality Management System Turbonetics also provides and supports Lot Traceability and material controls in accordance with AS9100 Quality Management System for many of our Military contracts Our Quality Policy Turbonetics Inc is committed to Designing Developing and Manufacturing the highest quality turbocharger heat exchanger pressure control and forced induction related products for our Customers by Striving to meet or exceed our Customers requirements and expectations for product quality performance and delivery Assuring quality objectives are established monitored and reviewed through our Plan Do Check and Act System Continuously improving our processes and systems through Customer feedback Quality audits Management reviews and Wabtec s Quality Performance System Ensuring our personnel are properly informed trained and empowered to improve quality and process control to better serve our Customers Treat each other with dignity and respect What Tools Strategies and Methods do we use that makes Turbonetics so Successful Team Involvement Employee Suggestion Program and Continuous Improvement

    Original URL path: http://www.turboneticsinc.com/industrial/support/quality-management-systems (2016-02-15)
    Open archived version from archive

  • Videos | Turbonetics Performance
    Hurricane T3 T3 TO4B E 60 Series T Series Mid Frame Turbos Y2K Thumper Intercoolers Vechile Specific Kits Universal Assemblies Air to air cores Air to Liquid Cores Custom Fabrication Valves Evolution Wastegate RG 45 Wastegate Godzilla BOV Accessories Exhaust Elbow Kit Turbo Systems Camaro SS V8 2010 2013 Shop Videos Latest Videos Turbonetics Capabilities Tour PRI 2013 SEMA 2013 Flex Wheeler PRI 2013Video 2 Turbonetics Engineering Story Subscribe for

    Original URL path: http://www.turboneticsinc.com/performance/page/videos (2016-02-15)
    Open archived version from archive

  • Contact | Turbonetics Performance
    Evolution Wastegate RG 45 Wastegate Godzilla BOV Accessories Exhaust Elbow Kit Turbo Systems Camaro SS V8 2010 2013 Shop Contact Turbonetics Headquarters 14399 Princeton Avenue Moorpark CA 93021 Phone 805 581 0333 Fax 805 584 1913 Email info turboneticsinc com Hours of Operation 8 00 AM 5 00 PM PST Our sales staff is here to help answer any questions that you might have We look forward to hearing from

    Original URL path: http://www.turboneticsinc.com/performance/contact (2016-02-15)
    Open archived version from archive

  • Welcome to Turbonetics | Turbonetics
    Core Values Contact Us Turbonetics News All News Wabtec Signs 27 Million Contract To Provide Signaling PTC For RTD Commuter Rail In Denver Wabtec has signed a 27 million contract with Regional Rail Partners to provide Phase I signaling and communications systems including Wabtec Reports 3Q EPS of 1 02 Up 10 Percent And Cash Flow From Operations of 144 Million Affirms Full Year Earnings Guidance Wabtec Reports 3Q EPS

    Original URL path: http://www.turboneticsinc.com/industrial/ (2016-02-15)
    Open archived version from archive

  • Welcome to Turbonetics Performance | Turbonetics Performance
    your convenience Turbocharger Series Exhaust Elbow Kit 3 0 or 3 5 Turbonetics Tight Radius Exhaust Elbow was designed for cramped engine bays Designed to maximize the flow and TNX Series Turbochargers 450 800 HP Turbonetics is pleased to present the TNX Series Turbocharger The Newest Addition To Our Line Up A clean sheet GT K 325 1000 HP The GT K series Turbonetics premium turbochargers covering the 325 to 1050 horsepower range is expanding its Grand National 475 700HP All Grand National Turbochargers are available with the exclusive Ceramic Ball Bearing option A Ceramic Ball Hurricane 325 1000 HP This family of turbochargers was developed with our customers through real world dyno and racetrack testing Today s T3 Turbo 250 400HP The T3 is the smallest family of turbochargers that Turbonetics offers Perfectly sized for applications under 2 T3 TO4B E 250 1000HP The T3 T4 Hybrid turbochargers consist of a T3 turbine section F1 49 F1 54 F1 57 F1 62 and a T4 compressor 60 Series 300 600HP These turbochargers are some of the most versatile units made because of the unique marriage of air flow and T Series 250 1000HP Turbonetics offers custom matched and custom built turbochargers designed to get you across the finish line first Mid Frame Turbos 900 1200HP Mid frame turbochargers are the absolute largest units with T4 flange Featuring Turbonetics Ceramic Ball Bearing as Y2K 1000 1500HP Y2K Series Turbochargers are a durable mid sized frame turbocharger capable of supporting up to 1 200 horsepower Thumper 1000 2000HP Whoever said size doesn t matter did not work with our R D department to develop the Super Thumper line of Turbonetics Engineering Story Latest News DIYAutoTune s Jerry Hoffmann takes two 210mph records at the Ohio Mile Take a ride in a

    Original URL path: http://www.turboneticsinc.com/performance/ (2016-02-15)
    Open archived version from archive

  • News | Turbonetics Performance
    Atlanta GA Today DIYAutoTune an industry leader in feature rich plug n play and professional engine management systems announced that their no 787 MS3 Pro 240SX set a new record in the E Motor Blown Gas Altered class at the ECTA sanctioned Ohio Mile Hot Rod Top Take a ride in a Stage 2 Turbonetics powered 5th Gen Camaro Posted 04 02 2015 at 03 28 am Moopark California Have you ever wondered what it would be like to experience 700 horsepower 5th Gen Camaro Well today is your lucky day You get to ride along with us and experience the sound and hear the power that our Stage 2 kit makes We hope that you enjoy it as much as we do Watch and experience it by clicking on the video below SEMA 2014 New Turbonetics TNX Line Y2K 88mm EF5 Turbo Redesigned Posted 01 16 2015 at 11 46 pm Coverage of the 2014 SEMA Show http www enginelabs com features sema coverage sema 2014 new turbonetics tnx line y2k 88mm ef5 turbo redesigned From Sand To Turbocharger Check Out How It s Made Posted 01 16 2015 at 11 43 pm If you ever wondered about how

    Original URL path: http://www.turboneticsinc.com/performance/news (2016-02-15)
    Open archived version from archive



  •